TNERC draft amendment in Intra State Open Access Regulation 2014 – availing of Open Access Power only for the contracted load above 1 MW – Comments invited – reg.
WAPP : +91-9952412329TNERC draft amendment in Intra State Open Access Regulation 2014 – availing of Open Access Power only for the contracted load above 1 MW – Comments invited – reg.