Power – Instructions issued by CFC/Revenue to collect the network charges for all the HT/LT consumers based on the Interim Order of Division bench

Power – TNERC fixed the additional surcharge at 10 paise/unit payable by the OA consumers (through IEX/3rd party) for the period from 29.04.2025 to 30.09.2025

Power – Instructions issued by CFC/Revenue not to collect the network charges for the petitioners other than the respondent in the WA. No.1400 of 2025

Rooftop solar connectivity in LT Bus Bar system under GISS Regulation in respect of HT consumers – clarification – reg

TANGEDCO petition before the TNERC regarding determination of additional surcharge for the period from April 2024 to September 2024 to be collected from OA consumers -reg

TNERC directed TANGEDCO to expedite the CGP verification of 100% owned WEGS for all pending years-reg

Power – Open Access – HT consumers having less than 1 MW contracted/sanctioned load – TNERC retains the provision in Intrastate Open Access Regulations 2014 – reg

Rooftop solar connectivity in LT Bus Bar system under GISS Regulation in respect of HT consumers – clarification – reg

Draft Green Energy Open Access Regulations 2024 -reg

Draft TNERC (Verification of Captive Status of Generating Plants/Consumers) Regulations 2024 -reg